Direct link to the article Splitting Time Between Product and Engineering Efforts

Splitting Time Between Product and Engineering Efforts

At each company I’ve worked, we have had a split between time spent on Product initiatives and Engineering work. The percentages always changed, sometimes 70% Product, 30% Engineering, sometimes as much as a 50/50 split. The impetus is to make …

Avatar of Sarah Drasner
Sarah Drasner on (Updated on )